Anish Kapoor Dirty Corner in Milan

29 May, 2011

Aerotrope  engineers provided the structural engineering for this large steel installation at Fabbrica del Vapore. Once again several aspects played into the concept: The sculpture would be fully accessible by the audience while over 200 tons of soil  accumulate on top and around it over time. We delivered the project on time and on budget. "Dirty Corner" can be visited until 8th of January 2012.

aerotrope rendering: Aerotrope

Tags: "Dirty Corner", Anish Kapoor, engineering design, Fabbrica del Vappore, form finding, installation art, large scale sculpture, sculpture engineering, steel sculpture

Comments (0)